Case Studies

Selected projects from international assignments in procurement, production, restructuring and site establishment.

Illustration: AI-generated

Our Case Studies

The projects presented encompass international leadership responsibility for up to 220 employees, purchasing volumes exceeding €100 million, as well as turnaround, greenfield, industrialisation and transformation projects across Europe, Asia and the Americas.

GENERAL MANAGEMENT & TURNAROUND
01

General Management of an Automotive Cable Plant – Turnaround to Double-Digit Profitability

Initial Situation

Assumed general management of an automotive cable plant in a difficult position. A negative operating result, outdated structures, high failure costs and inadequate delivery reliability jeopardised OEM approvals and market position. Full P&L responsibility for approximately €80 million in revenue.

Measures

Building a high-performing management team, restructuring production, introducing lean methods, developing new product lines, optimising cost structures and quality systems to automotive standard.

Result

Nine years of successful general management, double-digit profit in 2022, failure costs −16%, OTD raised to 95% (+18%), DAkkS laboratory accreditation.

INTERNATIONAL SITE ESTABLISHMENT
02

Plant Establishment in China – €20 Million Greenfield with OEM Approval

Initial Situation

Greenfield project in China with an investment volume of €20 million. No existing team, no infrastructure, significant time pressure from OEM requirements.

Measures

Site selection, machinery selection and procurement, building a high-performing local team, securing OEM approval and ISO 16949 certification.

Result

Production start within 10 months, budget held at €20 million, successful OEM approval and ISO 16949 certification.

INDUSTRIAL PARTNERSHIPS
03

Supplier Development Europe–Asia – €100 Million Purchasing Volume

Initial Situation

Purchasing volume exceeding €100 million with high dependence on European high-cost countries. Lack of market knowledge and supplier base in Asian markets, particularly China.

Measures

Personal market visits and supplier audits in Asia, building an international supplier network, developing a relocation strategy from high-cost to low-cost countries, cross-cultural negotiation and long-term partnership development.

Result

Annual savings of 7–10%, sustainable global supplier partnerships, effective risk management through diversification.

PRODUCTION & PROCESS OPTIMISATION
04

Lean Transformation in a Production Plant with 220 Employees

Initial Situation

Production volume €170 million, 220 employees. Optimisation potential in processes, equipment efficiency, set-up times and delivery performance.

Measures

Introduction of 5S and lean, push-pull principles, set-up time optimisation, equipment efficiency improvement, batch-size optimisation and design-to-cost projects for product cost optimisation.

Result

Product costs −15–20%, OTD improvement to 92% (+20%), reduction of time-to-market from 6–8 to 4–6 months.

INDUSTRIALISATION & SERIES LAUNCHES
05

Industrialisation of the World's First Corrugated Aluminium Cable

Initial Situation

Development and industrialisation of an entirely new cable type with no comparable reference worldwide. Highest technical demands on material, manufacturing processes and quality assurance.

Measures

Industrialisation and series launch of the world’s first corrugated aluminium cable, development of new manufacturing processes, securing series readiness and international rollout to several production sites.

Result

Successful worldwide market launch, reduction of time-to-market for transfer projects from 4 to 2 months.

TECHNOLOGY TRANSFER
06

Technology & Site Transfer

Initial Situation

In the course of integrating a German production site into a French corporate group, technology, know-how and production responsibility were transferred to France – including demanding product development.

Measures

Transfer planning with cost planning, layout and machinery relocation, intensive training and qualification of the French workforce, ensuring production continuity throughout the relocation.

Result

On-schedule project completion, variable margin 30–35%, full technology transfer with no production interruption.

TURNAROUND CONSULTING
07

Turnaround Consulting, Cable Plant South Africa

Initial Situation

Cable plant in economic distress with liquidity shortfalls, delivery problems, quality challenges and substantial restructuring needs.

Measures

Analysis of operational capability, stabilisation of critical processes, supporting management with restructuring measures, improving production, quality and delivery processes.

Result

Created transparency, identified fields of action, supported operational stabilisation and developed sound decision-making foundations for owners and investors.

GLOBAL OPERATIONS MANAGEMENT
08

Leading a Global Production Network with Four International Sites

Initial Situation

Overall operational responsibility for cable plants across four continents – simultaneously, with different cultures, markets and regulatory requirements.

Measures

Building local leadership teams, harmonising processes and production standards across all sites, cross-site optimisation of machinery and equipment, cross-cultural leadership and transformation of the production networks.

Result

Successful operational leadership and development of four international production sites, harmonised production standards, significant efficiency gains, reduction of time-to-market for transfer projects from 4 to 2 months.

Arrange a no-obligation initial consultation.

Together we develop pragmatic solutions for procurement, production, international collaboration and transformation.